Decision Support System for Evacuation Route-Schedule Planning:
Determining Optimal Network Configuration


Task 1 - Analysis of Large Scale Network Data Sources
Acquire and study documentation on file formats of large scale network (e.g. Tranplan demographic dataset and/or Mn/DOT base map). Develop software tools to read an graphically display the large scale network o verify understanding of file formats.
Deliverables: Demonstration and summary report (refer to Section 4.1.2 of Final Report)

Task 2 - Analysis of DYNASMART-P Data Formats
Install DYNASMART-P with sample datasets. Acquire and study documentation on DYNASMART-P input file formats and derive format specifications. Develop software tool to generate DYNASMART-P datasets and validate it using small test cases.
Deliverables: Demonstration and summary report (summary, ER-diagram)

Task 3 - GIS-based Network Management Software
Work with transportation safety, security, and maintenance and construction professionals in Mn/DOT to understand sub-networks of interests. Develop software tool to allow transportation professionals to graphically specify sub-networks using a map of the transportation network. The software will produce input data files for traffic simulation tools, e.g. DYNASMART-P, for selected sub-network.
Deliverables: Software (available upon request), user manual, summary report

Task 4 - Network Re-Configuration Analysis
Work with transportation safety and security professionals to understand the requirements for network re-configuration. Develop heuristic algorithms too produce re-configured network. Evaluate performance of the heuristics using traffic-simulation tools. Seek feedback from the technical advisory panel towards possible refinements of the heuristics.
Deliverables:
      Enhanced GIS-based network management software (available upon request),
      summary report (refer to Section 2 of Final Report)

Task 5 - Final Report Preparation
Prepare final report draft, incorporate technical advisory panel comments into final report, prepare final report.
Deliverables: Final report (doc, pdf) revised by CTS editorial comments


Presentation Slides
ACMGIS'05 Paper